Mine Subsidence and Structural Repair


First, the brick veneer and concrete flatwork is removed, then the steel support beams are installed.

 


The house is then raised back up to level and held in place. Next the footings and foundation are removed and replaced. The house is then secured to the new foundation.

 


The steel is removed, the concrete drive, garage and porch are poured. The brick veneer finishes the exterior walls.

 

 

 

 

 

 

 
 